What kind of maintenance do SIP house requires?

Over time mineral wool tends to fall down in a house frame. This leads to empty areas inside the walls, and loss of insulating material. In order to achieve the same thermo insulating performance, house reconstruction is needed after 5-7 years. ONO panels with Neopor, eliminates this problem completely. In other words SIP house requires the same care as in the brick building.

What is SIP?

  • Structural Insulated Panel (SIP) is composite building material consisting of an insulating layer, sandwiched between two layers of structural board (most common OSB).
  • Structural insulated panels consist of three components:
    • two facings (OSB)
    • an inner core of insulating material
    • the adhesive to bond the facings to the core
      SIP sumustinis.jpg
  • Inner core could be made of expanded polystyrene (EPS), extruded polystyrene (XPS) or rigid polyurethane foam
    • Bakūžė LT panels insulated using Neopor which is superior to its predecessor – conventional EPS, and has 20% better thermal insulation (ONO abbreviation: OSB-Neopor-OSB).

SIP house vs frame, brick or log house

SIP ONO panel house:

Low cost and Energy efficient houses are made from premanufactured at Bakūžė Lt factory ONO SIP panels.

ONO (OSB-Neopor-OSB) panel is with Neopor foam for innovative house insulation:

6

 

SIP vs frame house

Insulation

  • Comparing walls with the same width and the same price level – ONO will have 20% better thermal insulation.

Strength and stability

  • ONO panel can withstand up to 10 tons/m2 of vertical load, and up to 2 tons/m2 transverse load.
  • Due to the standardized and all-in-one nature of SIPs constructing, ONO panels will result in a tighter building envelope.

Construction

  • Conventional frame house with the area of 120m² can be mounted within 3-5 days, ONO panel house within 6-10.
  • ONO panels gives building great construction stability and strength, which naturally makes building very versatile in terms of external decoration – any material could be applied as exterior finish.
  • Cranes and other lifting and installation equipment is necessary when constructing frame house panels, ONO panels construction doesn’t need such heavy equipment and therefore is very versatile to be installed in any rough, mountainous terrain.

Endurance

  • Over time mineral wool tends to fall down in a house frame. This leads to empty areas inside the walls, and loss of insulating material. In order to achieve the same thermo insulating performance, house reconstruction is needed after 5-7 years.
  • ONO panels with Neopor, eliminates this problem completely.

SIP vs conventional brick or log houses

Insulation

  • Comparing the same wall thickness, ONO panel will have 4 times better thermal insulation than brick wall.

Construction

  • At amazing speed (within 6-10 days) main building structure from ONO panels can be complete. Jobs are almost resistant to meteorological impact – construction is possible at any time of the year, except extreme conditions – very strong wind, temperatures below –20˚ C.

Price

  • ONO house construction is 20-50 % cheaper than the​​ same area brick house.
  • ONO house is much lighter, so foundation is simpler and also cheaper.

Space

  • Thanks to the thinner external ONO walls, customer gets up to 10% more space compared with analogous log or brick house.

Atmospheric Influence

  • ONO does not absorb and keep moisture unlike brick.
  • ONO provide outstanding resistance to temperature and humidity fluctuations.
  • ONO houses could be accommodated immediately after construction is finished, unlike log houses. Log houses have to pass 6-12 months stabilization period.

How long does it take to develop and build SIP house?

  • After construction design is complete, within several days, all panels will be manufactured according to it;
  • All manufactured SIPs, other elements will be brought to a construction site, and within 1-2 weeks, whole building will be completely mounted.

Could SIP technology be applied to any design or just to standard projects?

There almost no limitations for individual house.

You have following alternatives:

  • You choose one of our offered standard projects;
  • You bring your own project;
  • You just give us an idea and our architect will draw your unique house project.

According to the project, we will design adjusted to the ONO technology construction plan, and it will take a couple weeks.